Non-contact water flow test on a 51″ pipe

The customer wanted to perform a water flow survey on a 1.5 mile long mains water pipeline at 5 different locations to ensure that there was no water leakage and that the flowrate was as per the design to meet the local demand.     This turned out to be a successful non-invasive water flow … Continue reading Non-contact water flow test on a 51″ pipe